|
<p class="MsoNormal" align="left" style="MARGIN: 0cm 0cm 0pt; LINE-HEIGHT: 16.5pt; TEXT-ALIGN: left; mso-pagination: widow-orphan; mso-margin-top-alt: auto; mso-margin-bottom-alt: auto;"><place wst="on"><placename wst="on"><span lang="EN-US" style="FONT-SIZE: 12pt; COLOR: black; mso-font-kerning: 0pt;">Shenyang</span></placename><span lang="EN-US" style="FONT-SIZE: 12pt; COLOR: black; mso-font-kerning: 0pt;">
<placename wst="on">Imperial</placename>
<placetype wst="on">alace</placetype></span></place><span lang="EN-US" style="FONT-SIZE: 12pt; COLOR: black; mso-font-kerning: 0pt;"> had been repaired in a large scale in 2003 for the application of World Heritage. Since that time on, no reparation have been done. Now this palace will be repaired in a whole scale and this is its third time of reparation. The reparation will be completed in 25<sup>th</sup>, July and nearly ninth percent of the palace will be fixed and painted. <p></p></span></p><p class="MsoNormal" align="left" style="MARGIN: 0cm 0cm 0pt; LINE-HEIGHT: 16.5pt; TEXT-ALIGN: left; mso-pagination: widow-orphan; mso-margin-top-alt: auto; mso-margin-bottom-alt: auto;"><span lang="EN-US" style="FONT-SIZE: 12pt; COLOR: black; mso-font-kerning: 0pt;">It has been said that although part reparation had been done every year, ninth percent of the building are in need of newly painted. The <place wst="on"><placename wst="on">Imperial</placename>
<placetype wst="on">alace</placetype></place> will keep intact after the reparation and it will be hard for the visitors to observe the vestiges of the new techniques used in the reparation. <p></p></span></p><p class="MsoNormal" align="left" style="MARGIN: 0cm 0cm 0pt; LINE-HEIGHT: 16.5pt; TEXT-ALIGN: left; mso-pagination: widow-orphan; mso-margin-top-alt: auto; mso-margin-bottom-alt: auto;"><span lang="EN-US" style="FONT-SIZE: 12pt; COLOR: black; mso-font-kerning: 0pt;">Nowadays, the workers are doing reparation to the bricks, tiles, beams and pillars instead of the discolored buildings because that it is hard for the experts to find any related recourses of the color drawing of these discolored buildings. And they have reported their plan of reparation to the national related departments. The final program will be come out soon.<p></p></span></p> |
|